Last volume was dealing with the final shaping of the horn- lam. Now the horn- lam has to be backed with sinew- fibres. But before backing the prod has to be wrapped with bundles of sinew- fibres.

precoating the prod all over its length at least 4 times

The wrappings are enforcing the joints of the horn- slats and the recurves

After having wrapped the prod with the sinew- bundles, the prod is wrapped with cotton- or silk cloth for to press the fibres as close as possible to the prod

2 weeks later the cloth- wrapping is removed- the prod is ready for the backing

About a quarter of  prod´s thickness will be the sinew- backing,  3- 4 layers of sinew- fibre- bundles has to be prepared. According to a total length of 30″ minus the recurves about 25″ of the prod´s length and an average- width of 2″ incl. the sides of the prod , so about 50 sq.inches have to be backed. As a total that means 4-5 buffalo- leg- sinews have to be spliced, at least a job of 8h.

The backed prod- one day after the backing

Closer and better sideview at the backing- one day after it has been done. The backing is still about 1/2" in thickness, when it is dry it will have about 1/3"- 1/4" of the prods thickness.

Waiting time! At first I planned to finish the prod in April or May, that´s to less time for the polymerisation. I´ll do it at the end of August, 9 month after having backed the prod.

So next volume will be focused on the braced and ready to final tiller- work prod.